Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 241022 Nampa Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 10/22/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 2508 & 2522 N Middleton Rd City/District: Nampa Contractor/Job#: Foreman: Employees: See Job List 03289-371, 017950-371 Tony Galvan Job Description: Abandon services System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024413131,2024413161 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Bedded and backfilled SF 418 with native soil 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Re lator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment SAT OPS 607 1 '/z" and 3/" Service IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 20. Line Locating SAT I OPS 611 21. Plastic Pine N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine SAT OPS 200 Coating was good, - Welder(s) Qualified OPS 201 internal pipe inspection Pipe/Coating—Inspected/Repaired OPS 202 was good, collected - Cathodic Protection OPS 306 wrap, capped off%" and - Non-Destructive Testing OPS 401 3/"tapping tees. - Welding Procedures OPS 407 Wrapped after - Removal of asbestos wrap OPS 402 completed. - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Intermountain Gas Crew abandon %" and 3/4" service lines in Nampa, ID. Address: 2508 & 2522 N Middleton Rd Observations Include: Verification of OQ records, line locating, bedding/backfilling, trenching, cut and abandon steel pipe, weld caps on tapping tees, internal/external pipe examinations, remove and reapply pipe wrap. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes LNo X Inspector(Lead): Perkins Date: 10/22/2024 Reviewer: Date: Brooks l IPUC Form 4 Rev. 12/Zv2023