Loading...
HomeMy WebLinkAboutIntermountain Gas 241017 Kuna Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 10/17/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company GC Address: 899 E Odyssey St City/District: Kuna 980 E Odyssey St Contractor/Job#: Foreman: Employees: See Job List 012576-375, 10594-375 Jose Garcilazo Job Description: Install V Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024412817,2024412693 On-Site: N Total Inspection Days: 1.0 Tasks: Ratin Critical Procedure# ! Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Bedded and backfilled SF 418 with saiidy native soil 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 Psi 15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder, pressure gauge only 15. EFV Installation SAT OPS 301 1200 EFV 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 I P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 21. Plastic Pipe SAT OPS 307 All joints were put - Joiner(s) Qualified OPS 309 together by stab fittings - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC install a 3/4" service line in Kuna, ID. Address: 899 and 980 E Odyssey St. Observations Include: Stab fittings, verification of OQ records, line locating,pressure testing, purging, bedding/backfilling, trenching, EFV install and tracer wire tie-in. Quizzed personnel on excavation rules/laws. Quizzed fuser on squeeze times. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes _ No X Follow-up Required: By Date: Yes No X Inspector(Lead): � Date: 10/17/2024 Perkins Reviewer: Brooks I Date: 10 -a9 IPUC Form 4 Rev. 12/21/2023