Loading...
HomeMy WebLinkAboutIntermountain Gas 241015 Eagle Construction IPUC Construction Inspection Inspector(s): Gatti, Brooks Date(s): 10/15/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 2192 W Clear Creek Drive City/District: Eagle Contractor/Job#: Foreman: Employees: Colin Zimmerman 425-115083 &425-118370 Rigo Charvarin Job Description: 3/" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle One-Call Ticket: 2024400428 On-Site: N Total Inspection Days: 2.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT _ OPS 603 Gas quality purge 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Continuity testing IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off _ 22. Steel Pine N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Observations Included: Trench depth, verification OQ records, verification equipment calibrations, valid dig ticket, tracer wire install, manual butt fusion,,squeeze off, successful pressure test,bedding with sand, backfill and continuity testing. Quizzed employee on applicable AOC of squeeze off procedures. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 10/15/2024 Galli Reviewer: Brooks Date: �0- IPUC Form 4 Rev. 12/2v2023