Intermountain Gas 241003 Meridian Construction
I PUC Construction Inspection Inspector(s): Galli, Brooks Date(s): 10/03/2024 Company/Owner: 1 Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: Duck Alley and Linder City/District: Meridian Contractor/Job #: Foreman: Employees: See Job List 413-1996 Walker Ray Kobi Voyson Job Description: 4" Main Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Will One-Call Ticket: 2024401075 On-Site: Y Total Inspection Days: 2.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labelin 2. Trenching/Boring—Depth, Clearance SAT OPS 308 At least 36 inches _ OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 IPUC Form 4 Re,. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Observations Included: Safety equipment, correct trench depth, OQ records, equipment calibrations, valid dig ticket, tracer wire install, bedding with sand, manual butt fusion. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 10/03/2024 Galli Reviewer: Brooks Date:J 17 a� IPUC Form 4 Rev. 12/21/2023