HomeMy WebLinkAboutIntermountain Gas 240919 Emmett Construction I PUC Construction Inspection Inspector(s): Galli Date(s): 09/19/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 2545 Empire St City/District: Emmett Contractor/Job#: Foreman: Employees: See Job List 413-04818 Jose Galvan Job Description: Relocate a 2" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: N/A One-Call Ticket: 2024374008 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 36 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration,Type SAT OPS 505 95 psi for 30 minutes 9. OQ Qualifications SAT OPS 800 Verified 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation N/A OPS 301 Did not observe 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment N/A SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 Did not observe IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe UNSAT OPS 307 Met-Fit install not - Joiner(s) Qualified OPS 309 consistent with - Fusion Tools OPS 324 manufacturer's - Heat Plate OPS 325 recommendations - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pibe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Observations Included: Trench depth, OQ records, equipment calibrations, valid dig ticket,pressure test, mechanical fittings, tracer wire install, squeeze off, bedding with sand, backfill and continuity testing. Discrepancies: IPUC inspector observed the crew not following manufactures recommendations while installing a 2"met-fit coupler. Per Figure 3 of JM Eagle's 2" Met-Fit manufacturer's recommendations, the movable part of the hydraulic tool shall be placed on the compression ring side of the Met-Fit coupler. IGC crews were observed installing the 2"Met-Fit coupler with the tool turned in the opposite orientation of what is displayed in Figure 3. Corrective Action Required: NOPV 1202416 Yes X No Follow-up Required: By Date: November 3, 2024 Yes X No Inspector (Lead): Date: 09/19/2024 Galli Reviewer: Brooks Date: I IPUC Form 4 Rev. 12/21/2023