Loading...
HomeMy WebLinkAboutIntermountain Gas 240912 Eagle Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 09/12/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company UGQ Address: 8070 W Fern St City/District: Eagle Contractor/Job#: Foreman: Employees: See Job List 048784-417 Rigo Chavarin Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 2024370927 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Bedded with sand, SF 418 backfilled native soil 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration,Type SAT OPS 505 96 Psi 15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 1200 EFV 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 One extinguisher not SF 422 inspected for September 19. Abandonment N/A OPS 607 IPUC Form 4 Re,. 12/2v2023 IPUC Construction Inspection 20. Line Locating SAT OPS 611 Located unmarked sprinkler lines 21. Plastic Pine SAT OPS 307 Fused on riser and EFV, - Joiner(s) Qualified OPS 309 stabbed onto-service stub - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC install a 3/4" service line in Eagle, ID. Address: 8070 W Fern St. Observations Include: Fusing, stab fittings, verification of OQ records, line locating, pressure testing, purging, bedding/backfilling, trenching, EFV install and tracer wire tie-in. Quizzed personnel on excavation rules/laws. Quizzed fuser on squeeze times. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(lead): Date: 09/12/2024 Perkins Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023