Commissioners,
We respectfully request that the Public Utilities Commission further consider our application to amend
CPCN 481 to include Pepperwood Crossing Division No. 2. Additionally, RMUC seeks to expand the
service area to encompass Division No. 1, Division No. 2, and Division No. 3 of the Pepperwood
Crossing Subdivision.
Please advise us on the next steps to proceed with this request.
Sincerely,
Jim Bernard
President
Rocky Mountain Utility Co., Inc.
From: Angie Velasquez
To: Monica Barrios-Sanchez
Subject: FW: Rocky Mountain Utility Co.Case No.ROC-W-24-01
Date: Friday,November 22,2024 8:10:54 AM
Attachments: NoticeofOwnershioChange RockyMtnUtilityCo(1)(1).odf
RMUC Reguest.odf
From: RMUC Admin <rockymountainutility@gmail.com>
Sent:Thursday, November 21, 2024 4:21 PM
To:Angie Velasquez<Anga.Velasquez@puc.idaho.gov>
Subject: Re: Rocky Mountain Utility Co. Case No. ROC-W-24-01
CAUTION: This email originated outside the State of Idaho network.Verify links and attachments
BEFORE you click or open, even if you recognize and/or trust the sender. Contact your agency
service desk with any concerns.
Hello,
Thank you for your patience as we reviewed the Interlocutory Order internally and consulted
with our Engineer. Below are the relevant updates for your consideration, along with the
attached request:
Hydraulic Modeling
RMUC has obtained approval from the Idaho DEQ, including a technical review, verifying
that adequate pumping capacity and piping have been constructed.
Water Right Transfer
We are actively working with Rocky Mountain Environmental Associates' Water Rights
Analysts to complete the transfer of water rights from J&L Holdings LLC to Rocky Mountain
Utility Co., Inc. The drafted Notice of Water Rights Change is also attached for you to
reference.
We look forward to your guidance on the next steps.
Sincerely,
Abbey
On Mon, Nov 4, 2024 at 9:48 AM Angie Velasquez <Anga.Velasquez(-cbpuc.idaho.gov>
wrote:
Attached is Interlocutory Order No. 36380 in Case No. ROC-W-24-01.
Thank you,
Angie Velasquez
Technical Records Specialist II
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg. 8, Ste. 201-A
Boise, ID 83714
208-334-0341
E-mail: anga.velasquezCcfpuc.idaho.gov
CONFIDENTIALITY NOTICE: This e-mail may be confidential, privileged, and exempt from public disclosure,
and the sender intends that it be used only by the individual or entity named above. If you are not the intended
recipient, then you may not use, disclose, copy, or distribute the e-mail or its contents. If you believe you have
received this e-mail in error, please immediately notify the sender and delete the copy you received.
BI
From: Angie Velasquez
To: Monica Barrios-Sanchez
Subject: FW: Rocky Mountain Utility Co.Case No.ROC-W-24-01
Date: Friday,November 22,2024 8:11:29 AM
Attachments: RMUC water rights Buick claim.odf
From: RMUC Admin <rockymountainutility@gmail.com>
Sent: Friday, November 22, 2024 7:31 AM
To: Angie Velasquez<Anga.Velasquez@puc.idaho.gov>
Subject: Re: Rocky Mountain Utility Co. Case No. ROC-W-24-01
CAUTION: This email originated outside the State of Idaho network. Verify links and attachments
BEFORE you click or open, even if you recognize and/or trust the sender. Contact your agency
service desk with any concerns.
Hi Angie,
I did receive this signed Quick Claim as it relates to the transfer of water rights after I had
emailed you last night. Please find it attached.
Abbey
On Thu, Nov 21, 2024 at 5:20 PM RMUC Admin <rockymountainutilityCcOgmail.com>
wrote:
Hello,
Thank you for your patience as we reviewed the Interlocutory Order internally and
consulted with our Engineer. Below are the relevant updates for your consideration, along
with the attached request:
Hydraulic Modeling
RMUC has obtained approval from the Idaho DEQ, including a technical review, verifying
that adequate pumping capacity and piping have been constructed.
Water Right Transfer
We are actively working with Rocky Mountain Environmental Associates' Water Rights
Analysts to complete the transfer of water rights from J&L Holdings LLC to Rocky
Mountain Utility Co., Inc. The drafted Notice of Water Rights Change is also attached for
you to reference.
We look forward to your guidance on the next steps.
Sincerely,
Abbey
On Mon, Nov 4, 2024 at 9:48 AM Angie Velasquez<Anga.Velasquez(a)puc.idaho.gov>
wrote:
Attached is Interlocutory Order No. 36380 in Case No. ROC-W-24-01.
Thank you,
Angie Velasquez
Technical Records Specialist II
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg. 8, Ste. 201-A
Boise, ID 83714
208-334-0341
E-mail: anga.velasquez(cOpuc.idaho.gov
CONFIDENTIALITY NOTICE: This e-mail may be confidential, privileged, and exempt from public
disclosure, and the sender intends that it be used only by the individual or entity named above. If you are not
the intended recipient,then you may not use, disclose, copy, or distribute the e-mail or its contents. If you
believe you have received this e-mail in error, please immediately notify the sender and delete the copy you
received.
E
RECORDING REQUESTED BYAND
WHEN RECORDED RETURN TO:
P
(Space Above for Recorder's Use)
QUITCLAIM DEED FOR WATER RIGHT
J&L Holdings,LLC, an Idaho limited liability company,whose address is PO Box 111,
Irwin, Idaho 83428, (hereinafter "Grantor") does by these presents remise, release, and forever
quitclaim unto Rocky Mountain Utility Company,Inc., an Idaho corporation, whose address is
2 N. Landmark Lane, Suite 4,Rigby, Idaho 83442, (hereinafter"Grantee") and to Grantee's heirs
and assigns forever, all of Grantor's right title and interest in the following water rights:
Water Permit No. 25-14497
Water Right No. 25-14510
Water Right No. 25-14511
Water Permit No. 25-14512
(hereinafter the"Water Right").
To have and to hold the said Water Right unto the Grantees, and to Grantees' successors
and assigns forever.
In construing this Quitclaim Deed for Water Rights and where the context so requires, the
singular includes the plural.
[SIGNATURES AND NOTARY BLOCKS ON FOLLOWING PAGE]
QUITCLAIM DEED FOR WATER RIGHT—PAGE 1
IN WITNESS WHEREOF, the undersigned have caused their names to be hereunto
subscribed.
DATED this day of October, 2024.
ynn ixon, Manager
STATE OF IDAHO )
)ss.
County of Bonneville )
This record was acknowledged before me on the 10 day of October, 2024, by Lynn
Dixon.
4 jju-�- /k -
(stamp) Signa re of N61ary Public
My Commission Expires: y/Zv 1 2-0ZI
AUBREE JO PINGRY
}� COMMISSION#20231689
c NOTARY PUBLIC
STATE OF IDAHO
PAY COMMISSION a-WIRES o4120r2M
QUITCLAIM DEED FOR WATER RIGHT—PAGE 2
Form 42-248/42-1409(6) Rev.6/22
STATE OF IDAHO
DEPARTMENT OF WATER RESOURCES
NOTICE OF CHANGE IN WATER RIGHT OWNERSHIP
1. List the numbers of all water rights and/or adjudication claim records to be changed. If you only acquired a portion of the water right
or adjudication claim, check"Yes"in the "Split?"column. If the water right is leased to the Water Supply Bank, check"Yes". If you
are not sure if the water right is leased to the Water Supply Bank,see#7 of the instructions.
Water Right/Claim No. Split? Leased to Water Water Right/Claim No. Split? Leased to Water
Supply Bank. Supply Bank?
25-14497 Yes ❑ Yes ❑ Yes ❑ Yes ❑
25-14510 Yes ❑ Yes ❑ Yes ❑ Yes ❑
25-14511 Yes ❑ Yes ❑ Yes ❑ Yes ❑
25-14512 Yes ❑ Yes ❑ Yes ❑ Yes ❑
Yes ❑ Yes ❑ Yes ❑ Yes ❑
2. Previous Owner's Name: J & L Holdings LLC
Name of current water right holder/claimant
3. NewOwner(s)/Claimant(s): Rocky Mountain Utility Company, Inc.
New owner(s)as listed on the conveyance document Name connector ❑and ❑or
2 N Landmark Lane, Suite 4 Rigby ID 83442
Mailing address City State Zip
208-520-2580 silverckl 00@gmail.com
Telephone Email
4. If the water rights and/or adjudication claims were split,how did the division occur?
❑ The water rights or claims were divided as specifically identified in a deed,contract,or other conveyance document.
❑ The water rights or claims were divided proportionately based on the portion of their place(s)of use acquired by the new owner.
5. Date you acquired the water rights and/or claims listed above: October 2024
6. Do you own the land identified as the water right place of use? Yes❑ No El
o If no,attach evidence that written notice of the change of water right ownership has been delivered to the landowner of record.
7. This form must be signed and submitted with the following REQUIRED items:
❑■ A copy of the conveyance document — warranty deed, quitclaim deed, court decree, contract of sale, etc. The conveyance
document must include a legal description of the property or description of the water right(s)if no land is conveyed.
❑ Plat map, survey map or aerial photograph which clearly shows the place of use and point of diversion for each water right
and/or claim listed above(if necessary to clarify division of water rights or complex property descriptions).
❑■ Filing fee(see instructions for further explanation):
o $25 per undivided water right.
o $100 per split water right.
o No fee is required for pending adjudication claims.
❑ If water right(s)are leased to the Water Supply Bank AND there are multiple owners,a Lessor Designation form is required.
❑ If water right(s)are leased to the Water Supply Bank,the individual owner or designated lessor must complete,sign and submit an
IRS Form W-9.
8. Signature: Owner
Signature of new owner/claimant Title,if applicable Date
Jim Bernard
Print name
Signature:
Signature of new owner/claimant Title,if applicable Date
Print name
For IDWR Office Use Only.
Receipted by Date Receipt No. Receipt Amt.
Active in the Water Supply Bank? Yes ❑ No❑ If yes,forward to the State Office for processing W-9 received? Yes ❑ No❑
Name on W-9 Approved by Processed by Date