Loading...
HomeMy WebLinkAbout20241101ASP to Staff 8 - Attachment ACM Phase 1.pdf a O ap \wk _ _ \w� After vat connect o a� proposed 6 C-900 water to existing �, v water with a saddle top and vo/ve. saw SCALE 1 = 50' Toe of existing c After testin and approval,connect 0 0.78 Ac. / �� ��\_ �� proposed 6 C-900 water to existing 7 // \ Roadside ditch wooer with o saddle tap and valve. h_20'Water easement / �� �\_ Asa \ Ex.San.M.H.J/1 (c v v 0.75Ac. 5 / I �..���� \ I / 0.75 Aa / / I \ Q Ix 0 10 0.81 Ac. 0.75 Aa l / / d O 1 / Z Q) I Existing canal San.M.H.J/8 l 0.75 Ac. < W Son.M.H. 7 a + 4 Lateral l / / (200 Ste.6+15 \ \ 30'Sewer and water easement l / 7 L 4"Lateral l l\Q z 777:�\ 7 \ 30'Sewer and water easement l l �/ 2 /� 4"SDR-35/c 0 / \ 6 /Q 0.75 As. / with 2"se an Ld rr P V \ l \'0177 \ l % l� W Toe of existing / V) W7 10'Sewer easemen g Z \ \ Son.M.H 6 0.78 Ac. _ / OLd Sta. 4+58 / 3/4"Wooer l / (16.0'Rt.) meter(typ.) San M.N. 1 1 San.M.H. 5 / / 0 Sto.2+39 / l / .5 Lt) _ 0.5 Aa 0 Sta. 3+61 6 / U) [[16.0"Rt) l 4"Son.lateral COUNTRYBEAR CIRCLE 1 (tYP) l /San.M.H. 4 — — 0 Sta. 1+72 8"San C=192' (27.1'RL) / I.E. 6188.01 4 E. 61882t (typ-)"San.lateral 7 / sq Sto. 4+99 21'Rt. / Q / l Instal/ BASIN 7 Sto. 4+08 21,it.— s"G.V.,Std FN/ \ Assy. w/7B. / dot/ San M.H./ I 6"x 6"tee, 6"G.V., / 9p0/ 0 Ste.3+63 sodtd F.H.. Assy., w/TB ��, / 0 / (22.4'Ct.) 12 1.09Aa / \ o /,/ /V1b 1 1 093 k. PROPOSED EXISTING / 13 SANITARY SEWER MANHOLE 0.75 Aa I San.M.H.JJ3 O 14 3 4"Water 0 Sta 5+03 30.4 Lt. SANITARY CLEANOUT • O 7 0.75 Aa meter(typ.) I Meadow Drive Existing channel Sto.5+6024.5'Rt.-I tal/6" 0 Sta. 0+34(29.9'Ct.) SANITARY SEWER sA Fy�.d m 7 � ns B — ® ass, 6"G.V. (3). Cap 6"to STORM MANHOLE QQ @ z °� o _ -- the SW for future connection. / // z a — — _ _ STORM SEWER --- o QJ� z STORM SEWER LATERAL a z o CATCH BASIN ■ ❑ o O z — — Stub 8"Sewer 4{ WATERMAIN& VALVE < m 0 Ste.6+14 (16.5'Lt) Sta.0+40 227'Rt.—Cap WATER METER&SERVICE 6"C-900 Main(L=60)for WATERLINE BLOWOFF future connection z rn FIRE HYDRANT '' o 1 EDGE OF PAVEMENT ---------- LU / POWER POLE t w U z n PAVEMENT w z o J W — U GRADING FILL AREA U v o CRADING CUT AREA