Loading...
HomeMy WebLinkAbout20241101ASP to Staff 1 - Attachment Water Monitoring Report Future from DEQ.pdf DEQ Public Drinking Water System Monitoring Schedule Report Print Date: October 26, 2024 ID6040042 - ASPEN CREEK WATER COMPANY Community water system serving 64 people and 69 connections. Regulated by: POCATELLO REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2024 and 12-31-2032 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM(TCR) 1 per MN 1/1 12/31 Mix" Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR-LEAD COPPER 5 per 6M due between 1/1/2025 and 6/30/2025 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 7/1/2025 and 12/31/2025 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 1/1/2026 and 6/30/2026 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 7/1/2026 and 12/31/2026 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 1/1/2027 and 6/30/2027 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 7/1/2027 and 12/31/2027 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 1/1/2028 and 6/30/2028 n/a n/a 'FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 7/1/2026 and 12/31/2028 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 1/1/2029 and 6/30/2029 n/a n/a 'FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 7/1/2029 and 12/31/2029 n/a n/a *FUTURE PBCU LCR-LEAD COPPER S per 6M due between 1/1/2030 and 6/30/2030 n/a n/a *FUTURE P8CU LCR-LEAD COPPER 5 per 6M due between 7/1/2030 and 12/31/2030 n/a n/a FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 1/1/2031 and 6/30/2031 n/a n/a *FUTURE PBCU LCR-LEAD COPPER 5 per 6M due between 7/1/2031 and 12/31/2031 n/a n/a *FUTURE Note:Consumer notice of lead tap results,regardless of lead level,is required within 30 days after receiving results.For templates and more information,please visit: https://www2.deq.idaho.gov/water/PublicNotificationTemplates Schedules for tag#: A0015882 Please Label Sampling Point/Location as: "LOVELAND WELL" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied ZN03 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a YES ALFA RADS-GROSS ALPHA 1 per 3t aae bete een W/01;2023 and 12j31 2025 n/a n/a NO SODI IOC-SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a NO URAN RADS-URANIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a NO ZN03 NITRATE 1 per YR due between 01/01/202S and 12/31/2025 n/a n/a *FUTURE ZN03 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZAPS ARSENIC(1005) 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZFLU IOC-FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS-PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZN02 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO VOCS VOCS-GROUP 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a NO URAN RADS-URANIUM I per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE ALFA BADS-GROSS ALPHA 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE R226 RADS-RADIUM 226 1 per 9Y due between 01/01/2023 and 12/31/2031 n/a n/a NO R228 RADS-RADIUM 228 1 per 9Y due between 01/01/2023 and 12/31/2031 n/a n/a NO ALFA RADS-GROSS ALPHA 1 per 3Y due between 01/01/2029 and 12/31/2031 n/a n/a *FUTURE URAN RADS-URANIUM 1 per 3Y due between 01/01/2029 and 1 213 1/203 1 n/a n/a *FUTURE ZN03 NITRATE 1 per YR due between 01/01/2031 and 12/31/2031 n/a n/a *FUTURE Date Primed: Saturday,October 26.2024 Page 1 of 2