Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 211019 Drug and Alcohol Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks I Date(s): 19-Oct-21 Company/Owner: Northwest Gas Processing Unit/OPID: 25223 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: 0.5 Construction: Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: F2 Inspection Summary 2021 Drug&Alcohol Audit Northwest Gas Processing Oct 5, 2021: (0.5 Standard Prep) Prepared for the Northwest Gas Processing drug and alcohol inspection through review of the PHMSA inspections Forms and 2020 inspection results. The company's pipeline system in Idaho consists of transmission and gathering lines. Oct 19, 2021: (2 D&A)typed report Bruce Perkins and Jeff Brooks of the Idaho Public Utilities Commission met with NWGP's Compliance Personnel, Operations Manager and Lead Operator at the New Plymouth office to review drug and alcohol program and records. PHMSA Forms were used as a guide throughout the audit to ensure all areas were completed as they pertain to program/records. Observations: NWGP has no Historical Drug&Alcohol test records as required by 49 CFR 199.117 Record Keeping Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview(emailed to compliance personnel) Miscellaneous Operator Verification Documents Corrective Action Required: Yes X No Follow-up Required: by(date): 26 Feb 2022 Yes X No Inspector(Lead): - f✓d' Date: Bruce Perkins / 'Z Reviewer: Date: IPUC Form 1