Loading...
HomeMy WebLinkAboutIntermountain Gas 210928-29 Pocatello Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks I Date(s): 28-29 Sep 2021 Company/Owner: IGC Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 4 Standard:FI Construction:El Training: F-] (T)(D)Integrity Management: Incident: M/M: = Follow-up: F4 OQ: Damage Prevention: D&A: Inspection Summary 28-29 Sep 2021 (4.0) Standard follow-up,typed reports IPUC personnel performed a follow-up inspection on 97 residential meter exchanges performed by an unqualified operator in the Pocatello district. The list of residences inspected by IPUC personnel is attached. Attachment(s) Addresses followed-up on in Pocatello District Corrective Action Required: Yes I Nol X Follow-up Required: by(date)-.,,-,? Yes Nol Inspector(Lead): Date: Bruce Perkins 29-Sep-21 Reviewer: Date: IPUC Form 1