HomeMy WebLinkAboutIntermountain Gas 210928-29 Pocatello Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Brooks I Date(s): 28-29 Sep 2021
Company/Owner: IGC Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 4
Standard:FI Construction:El Training: F-] (T)(D)Integrity Management: Incident:
M/M: = Follow-up: F4 OQ: Damage Prevention: D&A:
Inspection Summary
28-29 Sep 2021 (4.0) Standard follow-up,typed reports
IPUC personnel performed a follow-up inspection on 97 residential meter exchanges performed by an unqualified
operator in the Pocatello district. The list of residences inspected by IPUC personnel is attached.
Attachment(s)
Addresses followed-up on in Pocatello District
Corrective Action Required: Yes I Nol X
Follow-up Required: by(date)-.,,-,? Yes Nol
Inspector(Lead): Date:
Bruce Perkins 29-Sep-21
Reviewer: Date:
IPUC Form 1