HomeMy WebLinkAboutIntermountain Gas 210712-15 Pocatello Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Brooks I Date(s): IJul 12-15, 2021 Company/Owner: I Intermountain Gas Company Unit/OPID: I Pocatello Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 10 Standard: 5.5 Construction: F-3] Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: 1.5 Damage Prevention: El D&A: Inspection Summary Audit consisted of inspecting field installed equipment and operator qualification for the Pocatello, Idaho inspection units. Records and procedures for all Idaho Intermountain Gas Units were inspected virtually in March 2021 at the Intermountain Gas Company(IGC) headquarters in Boise, Idaho. July 12, 2021: (1.5 Construction, .5 OQ) Observed a KV Utilities crew, line locating, potholing and equipment staging in preparation of installing a new service line at 865 W Bridge St. in Blackfoot, ID. July 13-14, 2021: (3.5 Standard, .5 OQ) Traveled to Pocatello and met with IGC company representatives in the Pocatello district office for in-brief and to begin field audit. Regulator Stations/Odorizers 60030, 60031, 60034, 60035, 60036, 60037, 60038, 60069, 60070, 60071, 60072, 60077, 60084, 60085, 60117, 60122, 60124 and 60126 were inspected for proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection,station warning signs and right-of-way clearances. Nineteen casing-to-carrier isolation checks, four Nineteen casing-to-carrier isolation checks, four cathodic protection rectifiers, one pipeline patrols, and ten emergency isolation valves were checked for proper operation. An IPUC Form 3 (exit interview) was performed following the district inspection with James Murphy(District Manager), Phillip Colborn (Operations Manager), Colleen Villegas (Compliance Audit Specialist), Kelly Crystal (Cathodic Technician) Jeremy DeGiulio (Valve Maintenance) and Sherm Schmidt (Meter Inspector) of Intermountain Gas Company. Observations: Casing: 667-00-401 had log leaning on it causing stress on the pipe. Casing: 667-01-703 needed carsonite replaced. Reg Station: 60122 needs protection (barriers)to prevent damage from farm equipment. July 15,2021: (1.5 Construction, .5 OQ) Observed IGC crew members purging, removing, and replacing 4" relief line on an HPSS at manufacturing facility. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary July 19, 2021: (2 Standard Post) Completed forms and typed report. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Form 4, Construction Inspection IPUC Field Equipment Status Worksheets PHMSA Form 2, Standard Inspection of a Gas Distribution Operator(IA Version) PHMSA Form 15 OQ Field Corrective Action Required: Yes X Na Follow-up Required: by(date):in 2022 Yes X No Inspector (Lead): Date: Bruce Perkin 19-Jul-21 Reviewer: Date: IPUC Form 1