Loading...
HomeMy WebLinkAboutIntermountain Gas 210317 Training Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Brooks I Date(s): 17-Mar-21 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1.5 Standard: Construction: Training: F175 (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection summary A training program inspection was performed on IGC and Dasco personnel at IGC's Boise office. March 17, 2021: (1.5 Training) IPUC inspectors observed Das-Co gas crews being classroom trained, taking written test and hands on training by IGC's training crew on Met Fits, Electro Fusion, Stab Fittings, Butt Fusion, Cutting as well as destructive testing Butt Fusion and Electro Fusion joints. Observation: After the classroom training, the Das-Co personnel went into the "Truck Barn" Shop for their hands-on evaluations. The Electro Fusion machine (Due 5-21-23) and Pyrometers (Both Due 10-26-21) were within calibration requirements. Attachments: Attendance sheets Corrective Action Required: Follow-up Required: Yes" No X Yes No X by(date): Inspector (Lead): � Date: Bruce Perkins `7 /Y14� Reviewer: Date: i7 L IPUC Form 1