HomeMy WebLinkAboutIntermountain Gas 210309-10 DIMP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Ulmer/Brooks Date(s): 9-10 Mar 2021 Company/Owner: Intermountain Gas Company Unit/OPID: DIMP/8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 8.5 StandardT—1 Construction:71 Training: F7 (T)(D) Integrity Management: 8.5 Incident: El M/M: F7 Follow-up: F7 OQ: F-1 Damage Prevention: E] D&A: EJ Inspection Summary Audit consisted of inspecting Intermountain Gas Company's Distribution Integrity Management plan (DIMP) against PHMSA Inspector Assistant (IA)question set, 49 CFR Part 192. This audit was performed by Idaho Public Utilities Commission's Pipeline safety inspectors virtually in a Teams meeting. The Distribution Integrity Management Plan was audited together by all inspectors and will submit audit reports,form and letters as required by their state. Feb 25, Mar 4, 2021: (3.5 DIMP Prep) Prepared for the DIMP Audit of Intermountain Gas Company. Reviewed company DIMP plan for compliance with 49 CFR part 192, 2016 inspection results and prepared PHMSA IA question set for the audit. March 9, 2021: (3 DIMP) Bruce Perkins, Darrin Ulmer and Jeff Brooks of the Idaho Public Utilities Commission met with Intermountain Gas Company personnel Kelley Gorringe and the Integrity Management Team virtually to conduct an audit of the company's DIMP. The PHMSA Inspector Assistant (IA) Program was used to conduct the DIMP audit. An IPUC Form 3 (exit interview) was performed following the inspection with Kelley Gorringe Compliance/Audit Specialist). Observations: Section 5.2.3 of the DIMP Plan states that ... Regulator stations are checked to ensure set points are correct to achieve regulator lockup and relief set pressures are confirmed that the relief will open at desired set pressures to protect MAOP... During field inspections within all the companies districts the PUC has found that not all regulator stations are plumbed for lockup and cannot be checked. March 10, 2021: (2 DIMP Post) Completed forms and typed report. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Corrective Action Required: Yes X No Follow-up Required: by(date Yes No X Inspector (Lead): Date: O Reviewer: Date: )v �r IPUC Form 1