Loading...
HomeMy WebLinkAboutIntermountain Gas 210302-04 LNG Nampa Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Ulmer/Brooks I Date(s): 2-4 Mar 2021 Company/Owner: Intermountain Gas Company Unit/OPID: I LNG/8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 9.5 Construction: Training: (T)(D)Integrity Management: Incident:Standard:F9.5 M/M: 71 Follow-up: F-1 OQ: F-1 Damage Prevention: El D&A: E] Inspection Summary February 22,2021: (3 Standard Prep) Reviewed the LNG plant Emergency Manual, Fire Manual, Operations Procedure Manual, Preventative Maintenance Guide, Plant Maintenance Training Manual, Equipment Operations Manual and Security Training Manuals for compliance with 49 CFR part 193, NFPA 59A. Prepared for the LNG inspection through review of the inspection forms and 2020 inspection results. March 2, 2021: (3 Standard) Bruce Perkins, Darrin Ulmer and Jeff Brooks of the Idaho Public Utilities Commission met with Intermountain Gas Company LNG Plant personnel Craig Chapen,Tim Murray and Kelley Gorringe to conduct an audit of records and field review for plant operations for calendar year 2020. The PHMSA Inspector Assistant(IA) Program was used to conduct a LNG Facility Inspection on the records and field portions as they applied to the facility. An IPUC Form 3 (exit interview) was performed following the inspection with Kelley Gorringe Compliance/Audit Specialist). March 3, 2021: (1.5 Standard) Inspectors returned to the LNG Plant to conduct the facility walk-around to verify the few observations from the IA PHMSA question set. March 4, 2021: (2 Standard Post) Completed forms and typed report. Recommendations are listed on IPUC Form 3 (attached). Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview Corrective Action Required: Yes X No Follow-up Required: y (date): Yes No X Inspector(Lead): % i J,, Date: A r Z 2 Reviewer: Date: oA10 Wlo�v c2O zI IPUC Form 1