HomeMy WebLinkAboutIntermountain Gas 210219 Training Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Ulmer/Perkins/Brooks I Date(s): 17-19 Feb 2021
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days: 7
Standard:F-1-] Construction: F3 Training: F3 (T)(D) Integrity Management: 71 Incident: 71
M/M: 71 Follow-up: F-1 OQ: 71 Damage Prevention: El D&A: E]
Inspection Summary
A construction inspection was performed on a KV Utilities crew at 2249 S TIGER (AKA S 100 E) in Jerome, Idaho
18 Feb 2021: (3.0 Construction)
Observed a KV Utilities crew excavating, installing tracer wire, bedding, lowering 6" PE pipe into a
trench and backfilling.
19 Feb 2021: (3.0 Training)
On 19 Feb we observed IGC gas crews being classroom trained at the Burley, Idaho office.Training consisted of
written test and hands on by Josh Shell on Met Fits, Stab Fittings, and Cutting. Typed Report
22 Feb 2021: (1.0 Standard Post)
Completed forms and typed report
Attachments:
IPUC Form 4 Construction Inspections
Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Itineraries for the IGC training classes
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by (date):
Inspector (Lead): Date:
Bruce Perkins 2/22/2021
Reviewer: Date:
IPUC Form 1