Loading...
HomeMy WebLinkAboutIntermountain Gas 210219 Training Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Brooks I Date(s): 17-19 Feb 2021 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 7 Standard:F-1-] Construction: F3 Training: F3 (T)(D) Integrity Management: 71 Incident: 71 M/M: 71 Follow-up: F-1 OQ: 71 Damage Prevention: El D&A: E] Inspection Summary A construction inspection was performed on a KV Utilities crew at 2249 S TIGER (AKA S 100 E) in Jerome, Idaho 18 Feb 2021: (3.0 Construction) Observed a KV Utilities crew excavating, installing tracer wire, bedding, lowering 6" PE pipe into a trench and backfilling. 19 Feb 2021: (3.0 Training) On 19 Feb we observed IGC gas crews being classroom trained at the Burley, Idaho office.Training consisted of written test and hands on by Josh Shell on Met Fits, Stab Fittings, and Cutting. Typed Report 22 Feb 2021: (1.0 Standard Post) Completed forms and typed report Attachments: IPUC Form 4 Construction Inspections Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Itineraries for the IGC training classes Corrective Action Required: Follow-up Required: Yes No X Yes No X by (date): Inspector (Lead): Date: Bruce Perkins 2/22/2021 Reviewer: Date: IPUC Form 1