HomeMy WebLinkAboutIntermountain Gas 211221 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks I Date(s): 21-Dec-21 Company/Owner: I IGC/Das-co Unit/OPID: 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction: 72 Training: (T)(D) Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspecton was performed on Das-co, a contractor for Intermountain Gas Company 21 Dec 2021 (2.0) contruction) Observed a Das-co crews installing 6" sleeve by pulling the sleeve back to tie in point off Avalon St in Kuna, Idaho.While excavating the trench in preparation for pulling 4"main through the sleeve the contractor struck a '/4"water line with shovel and caused a leak. Dasco supervisor upon seeing the leak, followed Idaho dig line laws and contacted the owner of the water line and provided support to the city of Kuna to stop the leak. '/4"water line was severely pitted and hence contractor is not being held liable for the leak. All procedures were followed. Attachments: IPUC Form 4 Contruction Inspection Daily inenerary located in file for the project OQ's for all observed employees are located in file for the project Pictures of job tickets/dig tickets Corrective Action Required: Yes No X Follow-up Required: by (d te): Yes No X Inspector (Lead): / Date: Perkins �-,/ 21-Dec-21 Reviewer: Date: -s 5 Brooks IPUC Form 1