HomeMy WebLinkAboutIntermountain Gas 211130 Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks Date(s): 30-Nov-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2
Standard: Construction:FZ Training: a (T)(D)Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
30 Nov 2021 (2.0) construction)
Observed Das-Co Utilities crew installing new W service line at 6621 W Randolph Dr, Boise, Idaho.All
procedures were followed.
Areas observed during this project were: Traffic control, excavating, line locating, and boring.
Attachments:
IPUC Form 4 Construction Inspections
Daily itenerary located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
inspector(Lead): Date:
Bruce Perkins j G_ 30-Nov-21