Loading...
HomeMy WebLinkAboutIntermountain Gas 211130 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 30-Nov-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction:FZ Training: a (T)(D)Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 30 Nov 2021 (2.0) construction) Observed Das-Co Utilities crew installing new W service line at 6621 W Randolph Dr, Boise, Idaho.All procedures were followed. Areas observed during this project were: Traffic control, excavating, line locating, and boring. Attachments: IPUC Form 4 Construction Inspections Daily itenerary located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X inspector(Lead): Date: Bruce Perkins j G_ 30-Nov-21 Reviewer: Date: IPUC Form 1