Loading...
HomeMy WebLinkAboutIntermountain Gas 211129 Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 29-Nov-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: i Standard:F—] Construction:El Training: F7 (T)(D)Integrity Management: F-1 Incident: M/M: F7 Follow-up: OQ: F-1 Damage Prevention: E-1 D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 29 Nov 2021 (1.0)construction, typed reports Observed a Das-co crews installing new%" PE service line off 4" main,observed line locating, potholing to locate all utilities, excavation, boring, pipe and tracer wire install at 3414 S Montana Ave, Caldwell ID.All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date� Yes No X Inspector(Lead): l" Date: Bruce Perkins y �.__ 29-Nov-21 Reviewer: ,/ Date: IPUC Form 1