HomeMy WebLinkAboutIntermountain Gas 211129 Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 29-Nov-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: i
Standard:F—] Construction:El Training: F7 (T)(D)Integrity Management: F-1 Incident:
M/M: F7 Follow-up: OQ: F-1 Damage Prevention: E-1 D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
29 Nov 2021 (1.0)construction, typed reports
Observed a Das-co crews installing new%" PE service line off 4" main,observed line locating,
potholing to locate all utilities, excavation, boring, pipe and tracer wire install at 3414 S Montana Ave,
Caldwell ID.All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date� Yes No X
Inspector(Lead): l" Date:
Bruce Perkins y �.__ 29-Nov-21
Reviewer: ,/ Date:
IPUC Form 1