Inspector(s): I Ulmer/Brooks Date(s): 6/8-9/2021
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days:1 3
Standard: Construction:F3 Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
8-9 Jun 2021: (3.0 Construction)
Observed a Das-co crew installing new 12" Steel Main from Middleton Rd along Ustick Rd to Northside with
multiple tie-ins in Caldwell, Idaho.All procedures were followed.
Areas observed during this project were: Horizontal Directional Drilling, Pipe handling, and welding.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (lead): Date:
�u vc1v. v2I
Reviewer: Date: