Loading...
HomeMy WebLinkAboutIntermountain Gas 210608-09 Caldwell Construction Idah��" Ul'� ipeline Safety Inspection Summary r Inspector(s): I Ulmer/Brooks Date(s): 6/8-9/2021 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days:1 3 Standard: Construction:F3 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 8-9 Jun 2021: (3.0 Construction) Observed a Das-co crew installing new 12" Steel Main from Middleton Rd along Ustick Rd to Northside with multiple tie-ins in Caldwell, Idaho.All procedures were followed. Areas observed during this project were: Horizontal Directional Drilling, Pipe handling, and welding. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (lead): Date: �u vc1v. v2I Reviewer: Date: IPUC Form 1