Inspector(s): Perkins Date(s): 17-Nov-21
Company/Owner: New Energy One Unit/OPID: 40203/08160
Inspection Type &Time (1 day) I Total Inspection Days:1 1.5
Standard: 0.5 Construction:F-1-1 Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
Construction inspections were performed on Das-co, a contractor for New Energy One and Intermountain Gas
Company.
17 and 18 Nov 2021: (1.0 Construction, 0.5 Standard,travel and typed reports)
Observed Das-co crews excavating, pipe handling, and performing traffic control,fusing, tracer wire installation,
and backfilling.All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
OQ's for all observed employees are located in file for the project.
Dig tickets
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF X by(date):
Inspector (Lead): f Date:
Perkins -�J % /✓vt� Z
Reviewer: Date:
IPUC Form 1