Loading...
HomeMy WebLinkAboutIntermountain Gas 211117 Filer NEO Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 17-Nov-21 Company/Owner: New Energy One Unit/OPID: 40203/08160 Inspection Type &Time (1 day) I Total Inspection Days:1 1.5 Standard: 0.5 Construction:F-1-1 Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Construction inspections were performed on Das-co, a contractor for New Energy One and Intermountain Gas Company. 17 and 18 Nov 2021: (1.0 Construction, 0.5 Standard,travel and typed reports) Observed Das-co crews excavating, pipe handling, and performing traffic control,fusing, tracer wire installation, and backfilling.All procedures were followed. Attachments: IPUC Form 4 Construction Inspections OQ's for all observed employees are located in file for the project. Dig tickets Corrective Action Required: Follow-up Required: Yes No X Yes NoF X by(date): Inspector (Lead): f Date: Perkins -�J % /✓vt� Z Reviewer: Date: IPUC Form 1