Loading...
HomeMy WebLinkAboutIntermountain Gas 211116 Jerome - Filer Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 7 16-Nov-21 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days:1 1 Standard: Construction:71 1 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Jurisdictional/Construction validation inspections were performed on 4 RNG facilites that are tied into Intermountain Gas Company(IGC) pipelines. 16 Nov 2021: (1.0 Construction/validation,travel and typed reports) Observed/validated jurisdictional control on 4 dairies that tie into IGC pipelines. AgPower Jerome;AA dairy, 305 County Line Road,Jerome; AmpAmericas(fully contained on private property). Pico Energy; Bettencourt B6 dairy, 3350 S. 2400 E. -Jerome; Montauk Renewables(fully contained on private property). Dry Creek; Dry Creek dairy, 2900 N 4200 E, Hansen; AmpAmericas (6 mile long pipeline crosses right of ways of several roads. New Energy One RNG facility outside of Twin Falls is 8.2 long 4" and 6" pipelines cross right of ways of several roads. Corrective Action Required: Follow-up Required: Yes No X Yes No FTI by(date): Inspector (Lead): z Date: Reviewer: Date: IPUC Form 1