Loading...
HomeMy WebLinkAboutIntermountain Gas 211021 Filer NEO Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): See Below 20th, 21st Oct 2021 Company/Owner: New Energy One Unit/OPID: 40203/08160 Inspection Type &Time (1 day) Total Inspection Days:1 4 Standard: Construction:F4 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Construction inspections were performed on Das-co, a contractor for New Energy One and Intermountain Gas Company. 20 and 21 Oct 2021: (4.0 Construction and typed reports) Observed Das-co crews excavating, pipe handling, and performing traffic control,fusing,tracer wire installation, and backfilling. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections OQ's for all observed employees are located in file for the project. Dig tickets Corrective Action Required: Follow-up Required: Yes No X Yes No X by (date): Inspector (Lead): Date: Perkins v' C%- �1 �C,__7 z e z t Reviewer: Dater IPUC Form 1