Inspector(s): Perkins/Brooks Date(s): See Below
16,27,30 Sep 2021
Company/Owner: New Energy One Unit/OPID: 40203/08160
Inspection Type &Time (1 day) Total Inspection Days:1 4
Standard:F-] Construction:F4 Training: F7 (T)(D)Integrity Management: Incident:
M/M: = Follow-up: Oct: = Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co,a contractor for New Energy One and Intermountain Gas
Company.
16,27 and 30 Sep 2021: (4.0 Construction and typed reports)
Observed a Das-co crew exposing pipe sleeves, pipe handling, pulling pipe thru sleeves and fusing.All
procedures were followed.
Attachments:
IPUC Form 4 Construction Inspections
OQ's for all observed employees are located in file for the project.
Dig tickets
Corrective Action Required: Follow-up Required: Yes No X
YesF1 No X ) by(date):
Inspector(Lead): Date:
Bruce Perkins 30 Sep 21
Reviewer: Date:
IPUC Form 1