Loading...
HomeMy WebLinkAboutIntermountain Gas 210930 Filer NEO Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): See Below 16,27,30 Sep 2021 Company/Owner: New Energy One Unit/OPID: 40203/08160 Inspection Type &Time (1 day) Total Inspection Days:1 4 Standard:F-] Construction:F4 Training: F7 (T)(D)Integrity Management: Incident: M/M: = Follow-up: Oct: = Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co,a contractor for New Energy One and Intermountain Gas Company. 16,27 and 30 Sep 2021: (4.0 Construction and typed reports) Observed a Das-co crew exposing pipe sleeves, pipe handling, pulling pipe thru sleeves and fusing.All procedures were followed. Attachments: IPUC Form 4 Construction Inspections OQ's for all observed employees are located in file for the project. Dig tickets Corrective Action Required: Follow-up Required: Yes No X YesF1 No X ) by(date): Inspector(Lead): Date: Bruce Perkins 30 Sep 21 Reviewer: Date: IPUC Form 1