Loading...
HomeMy WebLinkAboutIntermountain Gas 210901 Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks I Date(s): 1-Sep-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1— StandardT-1 Construction: -2 Training: F7 (T)(D)Integrity Management: Incident: M/M: F1 Follow-up: OQ: = Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 1 Sept 2021 (2.0) construction,typed reports Observed a Das-co Utilities crew installing new%" service line at 2416 Wyoming Ave, Caldwell Idaho. All procedures were followed. Areas observed during this project were: Excavating, pressure testing, riser install,tracer wire install, purging, potholing, boring,JSA, IGC bagging the meter and squeezing. Attachments: IPUC Form 4 Construction Inspections Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes I No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Bruce Perkins Bruce Perkins 1-Sep-21 Reviewer: Date: IPUC Form 1