Loading...
HomeMy WebLinkAboutIntermountain Gas 210831 Emmett Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 31-Aug-21 Company/Owner: IGC Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: ConstructionT71 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company Observed a Das-co crews installing new 3/4"PE service line, Setting riser and tie-in to 3/4"main at 1740 Rome Ave, Emmett ID. All procedures were followed. Areas observed during this project were: Excavating, pipe handling,distribution line installation,tracer wire installation, bedding,backfilling and boring. Attachments: IPUC Form 4 Construction Inspections Das-co daily itenerary Corrective Action Required: Yes No X Follow-up Required: by(date): Yes Nol X Inspector(Lead): Date: Perkins Bruce Perkins �L 31-Aug-21 Reviewer: Date: IPUC Form 1