HomeMy WebLinkAboutIntermountain Gas 210831 Emmett Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 31-Aug-21
Company/Owner: IGC Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard: ConstructionT71 Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company
Observed a Das-co crews installing new 3/4"PE service line, Setting riser and tie-in to 3/4"main at 1740 Rome
Ave, Emmett ID. All procedures were followed.
Areas observed during this project were: Excavating, pipe handling,distribution line installation,tracer wire
installation, bedding,backfilling and boring.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itenerary
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes Nol X
Inspector(Lead): Date:
Perkins Bruce Perkins �L 31-Aug-21
Reviewer: Date:
IPUC Form 1