HomeMy WebLinkAboutIntermountain Gas 210426-29 Jerome - Twin Falls Construction r Idaho P C ipeline Safety Inspection Summary Inspector(s): Ulmer Date(s): 4/26-29/2021 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4 Standard:F—] Construction:F4 Training: F7 (T)(D) Integrity Management: E] Incident: EJ M/M: F7 Follow-up: F-1 OQ: F7 Damage Prevention: E] D&A: Inspection Summary A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company. April 26-27,2021 (2.0 construction) Observed a KV crew's excavation practices while installing conduit at 118/120 Doral Dr,Jerome, ID. Excavation included a back-hoe, hand-digging and rock-hammer for lava rock. April 28-29,2021 (2.0 construction) Observed a KV crew installing a new 3/4" PE service line at 3138 Boehm Estates Dr,Twin Falls, ID. Areas observed during this project were: Excavating, pot holing, thumper-bore, service line installation,tracer wire installation, stab fitting installation, riser setting, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections X2 KV daily itinerary Corrective Action Required: Yes No X Follow-up Required: by(dat Yes No X Inspector (Lead): ffV� Date: Reviewer: I Date: IPUC Form 1