Inspector(s): Perkins/Brooks I Date(s): 7-9 Jun 2021
Company/Owner: IGC Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Day :1 4
Standard:F-1 Construction:F4 Training: F7 (T)(D) Integrity Management: Incident: a
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company
Observed Das-co crew installing new 6"PE distribution line at Hwy 45 and Lake Shore Dr. in Nampa,
ID. And an ELM locator performing duties. All procedures were followed.
Areas observed during this project were: Line locating, excavating,pipe handling, fusing, electro fusing,
distribution line installation,tracer wire installation,bedding/slurry,backfilling,boring and pot-holing.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itenerary
Corrective Action Required: Yes No X
Follow-up Required: by (date): - Yes No X
Inspector (Lead): Date:
Perkins %i _ 10-Jun-21
Reviewer: Date:
Ulmer