Loading...
HomeMy WebLinkAboutIntermountain Gas 210607-09 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks I Date(s): 7-9 Jun 2021 Company/Owner: IGC Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Day :1 4 Standard:F-1 Construction:F4 Training: F7 (T)(D) Integrity Management: Incident: a M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company Observed Das-co crew installing new 6"PE distribution line at Hwy 45 and Lake Shore Dr. in Nampa, ID. And an ELM locator performing duties. All procedures were followed. Areas observed during this project were: Line locating, excavating,pipe handling, fusing, electro fusing, distribution line installation,tracer wire installation,bedding/slurry,backfilling,boring and pot-holing. Attachments: IPUC Form 4 Construction Inspections Das-co daily itenerary Corrective Action Required: Yes No X Follow-up Required: by (date): - Yes No X Inspector (Lead): Date: Perkins %i _ 10-Jun-21 Reviewer: Date: Ulmer IPUC Form 1