Loading...
HomeMy WebLinkAboutIntermountain Gas 210602-4 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins I Date(s): 2-4 Jun 2021 Company/Owner: IGC Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 3 Standard:71 Construction: F3 Training: F__� (T)(D)Integrity Management: E=1 Incident: M/M: F7 Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company Observed Das-co crew installing new 6"PE distribution line at Hwy 45 and Lake Shore Dr. in Nampa, ID. All procedures were followed. Areas observed during this project were: Line locating, excavating,pipe handling, fusing, electro fusing, distribution line installation, tracer wire installation, bedding/slurry,backfilling,boring and pot-holing. Attachments: IPUC Form 4 Construction Inspections Das-co daily itenerary Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Perkins 4-Jun-21 Reviewer: Date: Ulmer t IPUC Form 1