HomeMy WebLinkAboutIntermountain Gas 210602-4 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins I Date(s): 2-4 Jun 2021
Company/Owner: IGC Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 3
Standard:71 Construction: F3 Training: F__� (T)(D)Integrity Management: E=1 Incident:
M/M: F7 Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company
Observed Das-co crew installing new 6"PE distribution line at Hwy 45 and Lake Shore Dr. in Nampa,
ID. All procedures were followed.
Areas observed during this project were: Line locating, excavating,pipe handling, fusing, electro fusing,
distribution line installation, tracer wire installation, bedding/slurry,backfilling,boring and pot-holing.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itenerary
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Perkins 4-Jun-21
Reviewer: Date:
Ulmer t