HomeMy WebLinkAboutIntermountain Gas 210601 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): I Perkins Date(s): 1-Jun-21
Company/Owner: IGC Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard: Construction: Fi_� Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company
Observed two Das-co crews installing new 3/4" PE service lines at 4897 N Glenrock Ave, 6032 W Daphne Dr
and 5967 W Daphne Dr, Meridian ID. All procedures were followed.
Areas observed during this project were: Line locating, excavating,pipe handling, service line installation, tracer
wire installation, stab fitting installation, EFV installation,pressure testing,bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itenerary
Corrective Action Required: Yes No X
Follow-up Required: by(dat : Yes No X
Inspector (lead): �, Date:
Perkins 1-Jun-21
Reviewer: ' Date:
Ulmer
IPUC Form 1