Loading...
HomeMy WebLinkAboutIntermountain Gas 210601 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): I Perkins Date(s): 1-Jun-21 Company/Owner: IGC Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: Construction: Fi_� Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company Observed two Das-co crews installing new 3/4" PE service lines at 4897 N Glenrock Ave, 6032 W Daphne Dr and 5967 W Daphne Dr, Meridian ID. All procedures were followed. Areas observed during this project were: Line locating, excavating,pipe handling, service line installation, tracer wire installation, stab fitting installation, EFV installation,pressure testing,bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itenerary Corrective Action Required: Yes No X Follow-up Required: by(dat : Yes No X Inspector (lead): �, Date: Perkins 1-Jun-21 Reviewer: ' Date: Ulmer IPUC Form 1