Loading...
HomeMy WebLinkAboutIntermountain Gas 210419 Eagle Construction 1 Idaho P C Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 19-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1 StandardT—1 Construction:71 1 Training: F__] (T)(D) Integrity Management: Incident: M/M: F-1 Follow-up: F-1 oCl: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 19 Apr 2021.(1.0) construction) Observed a Das-co crew installing a new W PE service line at 560 E State St, Eagle ID. All procedures were followed. Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Reviewer: Date: IPUC Form 1