Idaho P C Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 19-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1
StandardT—1 Construction:71 1 Training: F__] (T)(D) Integrity Management: Incident:
M/M: F-1 Follow-up: F-1 oCl: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
19 Apr 2021.(1.0) construction)
Observed a Das-co crew installing a new W PE service line at 560 E State St, Eagle ID. All procedures were
followed.
Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer
wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itinerary
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector(Lead): Date:
Reviewer: Date:
IPUC Form 1