HomeMy WebLinkAboutIntermountain Gas 210429 Hailey Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks I Date(s): 29-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1,ti
Standard: ConstructionT.31 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
An incident inspection was performed on KV, a contractor for Intermountain Gas Company
29 Apr 2021 (1.0) construction)
Observed a KV crew repairing a line strike with gas leak on a service line from a 2" main on 105 Homestead Dr,
Hailey, ID. All procedures were followed.
Areas observed during this project were: Emergency response, line locating, excavation, and traffic control.
Attachments:
IPUC Form 4 Construction Inspections
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Reviewer: Date: