Inspector(s): Perkins, Brooks Date(s): 7 28-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 816o
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:FI Construction: F2 Training: (T)(D)Integrity Management: Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on KV, a contractor for Intermountain Gas Company
28 Apr 2021 (2.0) construction)
Observed a KV crew installing a new W PE service line at 257 W 3RD St, Burley, ID.All procedures were
followed.
Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer
wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
KV daily itinerary
As-built
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes I No X