Loading...
HomeMy WebLinkAboutIntermountain Gas 210428 Burley Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 7 28-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 816o Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:FI Construction: F2 Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on KV, a contractor for Intermountain Gas Company 28 Apr 2021 (2.0) construction) Observed a KV crew installing a new W PE service line at 257 W 3RD St, Burley, ID.All procedures were followed. Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections KV daily itinerary As-built Corrective Action Required: Yes No X Follow-up Required: by(date): Yes I No X Inspector (Lead): Date: Art Reviewer: f A Date: <� 3 121&t IPUC Form 1