HomeMy WebLinkAboutIntermountain Gas 210125 Boise Construction Idah P C Pipeline Safety Inspection Summary
Inspector(s): Ulmer Date(s): 25-Jan-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard:F-1 Construction:FI Training: F-1 (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
20 January 2021: (1 Construction)
Observed a Das-co crew on a 2" main replacement along E. Independence Dr. and S. Vintage Way, Boise, Idaho.
All procedures were followed.
Areas observed during this project were: line locating, keyholing, excavation, pipe installation,tracer wire
installation, MetFit coupler, foam pigging, pressure testing and verified OQ's.
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Corrective Action Required: Yes No X
Follow-up Required: b ( at Yes No X
Inspector (lead): � Date:
ate�c�in. o?C>z
Reviewer: Date:
IPUC Form 1