Loading...
HomeMy WebLinkAboutIntermountain Gas 210125 Boise Construction Idah P C Pipeline Safety Inspection Summary Inspector(s): Ulmer Date(s): 25-Jan-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard:F-1 Construction:FI Training: F-1 (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 20 January 2021: (1 Construction) Observed a Das-co crew on a 2" main replacement along E. Independence Dr. and S. Vintage Way, Boise, Idaho. All procedures were followed. Areas observed during this project were: line locating, keyholing, excavation, pipe installation,tracer wire installation, MetFit coupler, foam pigging, pressure testing and verified OQ's. Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Corrective Action Required: Yes No X Follow-up Required: b ( at Yes No X Inspector (lead): � Date: ate�c�in. o?C>z Reviewer: Date: IPUC Form 1