Loading...
HomeMy WebLinkAboutIntermountain Gas 210427 Twin Falls Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 27-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2 Standard:F] Construction:52 Training: F__J (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on KV, a contractor for Intermountain Gas Company 27 Apr 2021 (2.0) construction) Observed a KV crew installing a new%" PE service line at 3551 E 4021 N (Wild Rose East) Twin Falls, ID.All procedures were followed. Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections KV daily itinerary Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: 2 q Reviewer: Date: �ia"P26ell'111 IPUC Form 1