HomeMy WebLinkAboutIntermountain Gas 210427 Twin Falls Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 27-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2
Standard:F] Construction:52 Training: F__J (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on KV, a contractor for Intermountain Gas Company
27 Apr 2021 (2.0) construction)
Observed a KV crew installing a new%" PE service line at 3551 E 4021 N (Wild Rose East)
Twin Falls, ID.All procedures were followed.
Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer
wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
KV daily itinerary
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): Date:
2 q
Reviewer: Date:
�ia"P26ell'111
IPUC Form 1