Inspection Summary
A construction inspection was performed on KV, a contractor for Intermountain Gas Company
26 Apr 2021 (2.0) construction)
Observed a KV crew installing a new W PE service line at 3637 N 3500 E, Kimberly, ID.
Areas observed during this project were: Line locating, excavating, and pneumatic hammer boring .
Attachments:
IPUC Form 4 Construction Inspections
KV daily itinerary
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes X No