Loading...
HomeMy WebLinkAboutIntermountain Gas 210426 Kimberly Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 26-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: a16o Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2 Standard: Construction:F2 Training: F—] (T)(D) Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on KV, a contractor for Intermountain Gas Company 26 Apr 2021 (2.0) construction) Observed a KV crew installing a new W PE service line at 3637 N 3500 E, Kimberly, ID. Areas observed during this project were: Line locating, excavating, and pneumatic hammer boring . Attachments: IPUC Form 4 Construction Inspections KV daily itinerary Corrective Action Required: Yes No X Follow-up Required: by(date): Yes X No Inspector (Lead): Date: 2 ZI Reviewer: Date: PM .V �r IPUC Form 1