Loading...
HomeMy WebLinkAboutIntermountain Gas 210111 Emmett Construction Idaho PUC Pipeline S e y Inspection Summary Inspector(s): Ulmer/Brook Date(s): 11-1an-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction:E11 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 11 January 2021 (2 construction) Observed a Das-co crew installing new 3/4" service line at 419 W 3rd St, Emmett, Idaho.All procedures were followed. Areas observed during this project were: traffic control, line locating, pot-holing, horizontal directional drilling, pipe pulling, pipe prep, welding steel service-T,verified OQ's Attachments: IPUC Form 4 Construction Inspections Das-co daily itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Yes No X Follow-up Required: y(date): Yes Nol X Inspector (Lead): Date: • fl Jctn �?1 Reviewer: Date: IPUC Form 1