HomeMy WebLinkAboutIntermountain Gas 210420-22 Boise Construction Idaho PUC Pipeline Saf ty spection Summary Inspector(s): Ulmer/Brooks Date(s): 4/20-22/2021 Company/Owner: Intermo ntai Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) - Total Inspection Days: 6 Standard:F] Construction:F6 Training: F7 (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company April 20-22, 2021 (6.0 construction) Observed a Das-co crew installing a new 2" PE Main and 3/4" PE service line at 1099/1123 Exchange St, Boise, ID. All procedures were followed. Areas observed during this project were: Excavating, pot holing, horizontal directional drilling, service line installation,tracer wire installation, stab fitting installation, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Corrective Action Required: A Yes No X Follow-up Required: by(da ): Yes No X Inspector(Lead): Date: Zb2 Reviewer: Date: IPUC Form 1