HomeMy WebLinkAboutIntermountain Gas 210420-22 Boise Construction Idaho PUC Pipeline Saf ty spection Summary
Inspector(s): Ulmer/Brooks Date(s): 4/20-22/2021
Company/Owner: Intermo ntai Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) - Total Inspection Days: 6
Standard:F] Construction:F6 Training: F7 (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
April 20-22, 2021 (6.0 construction)
Observed a Das-co crew installing a new 2" PE Main and 3/4" PE service line at 1099/1123 Exchange St, Boise,
ID. All procedures were followed.
Areas observed during this project were: Excavating, pot holing, horizontal directional drilling, service line
installation,tracer wire installation, stab fitting installation, bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itinerary
Corrective Action Required: A Yes No X
Follow-up Required: by(da ): Yes No X
Inspector(Lead): Date:
Zb2
Reviewer: Date:
IPUC Form 1