Loading...
HomeMy WebLinkAboutIntermountain Gas 210419 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer Date(s): 19-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1 Standard:F-I Construction: F-1-1 Training: F7 (T)(D) Integrity Management: E:1 Incident: F7 M/M: F7 Follow-up: 71 OQ: F-1 Damage Prevention: E] D&A: EJ Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company April 19, 2021 (1.0 construction) Observed a Das-co crew installing a new 1800 EFV on PE service line at 1957 N Luge Ave, Eagle, ID. All procedures were followed. Areas observed during this project were: Excavating, stab fitting installation, EFV installation, pressure testing, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Corrective Action Required: Yes No X Follow-up Required: by at Yes I No X Inspector (Lead): Date: ti r Reviewer: Date: IPUC Form 1