HomeMy WebLinkAboutIntermountain Gas 210419 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Ulmer Date(s): 19-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1
Standard:F-I Construction: F-1-1 Training: F7 (T)(D) Integrity Management: E:1 Incident: F7
M/M: F7 Follow-up: 71 OQ: F-1 Damage Prevention: E] D&A: EJ
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
April 19, 2021 (1.0 construction)
Observed a Das-co crew installing a new 1800 EFV on PE service line at 1957 N Luge Ave, Eagle, ID. All
procedures were followed.
Areas observed during this project were: Excavating, stab fitting installation, EFV installation, pressure testing,
bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itinerary
Corrective Action Required: Yes No X
Follow-up Required: by at Yes I No X
Inspector (Lead): Date:
ti r
Reviewer: Date:
IPUC Form 1