Loading...
HomeMy WebLinkAboutIntermountain Gas 210414-15 Boise Construction Idaho PUC III i line Safety Inspection Summary Inspector(s): I Ulmer I Date(s): 4/14-15/2021 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 $tandard:F—] Construction:F2 Training: F_� (T)(D)Integrity Management: =1 Incident: E] M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 14-15 Apr 2021 (2.0) construction) Observed a Das-co crew installing a new W PE service line at 512 N Brookdale Dr, Boise, ID.All procedures were followed. Areas observed during this project were: Excavating, horizontal directional drilling, pipe handling, service line installation,tracer wire installation, EFV installation, pressure testing, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Misc. Photos Corrective Action Required: Yes No X Follow-up Required: bi(date): Yes I No X Inspector(Lead): Date: Reviewer: Date: IPUC Form 1