Loading...
HomeMy WebLinkAboutIntermountain Gas 210414 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks Date(s): 14-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standardf—1 Construction:72 ] Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 14 Apr 2021 (2.0) construction) Observed a Das-co crew installing a new%" PE service line at 17721 N Harpster Way, 8408 E Dutchman St, 8364 E Harpster Ct, and 8365 E Harpster Ct, Nampa, ID. All procedures were followed. Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Reviewer: Date: IPUC Form 1