HomeMy WebLinkAboutIntermountain Gas 210414 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks Date(s): 14-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standardf—1 Construction:72 ] Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
14 Apr 2021 (2.0) construction)
Observed a Das-co crew installing a new%" PE service line at 17721 N Harpster Way, 8408 E Dutchman St, 8364
E Harpster Ct, and 8365 E Harpster Ct, Nampa, ID. All procedures were followed.
Areas observed during this project were: Line locating, excavating, pipe handling, service line installation, tracer
wire installation, stab fitting installation, EFV installation, pressure testing, bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itinerary
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Reviewer: Date:
IPUC Form 1