Inspector(s): Perkins/Brooks Date(s): 13-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:
Standard:F—] Construction:F2 ] Training: F__] (T)(D) Integrity Management: El Incident:
M/M: = Follow-up: = oQ: F-1 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
13 Apr 2021 (2.0) construction)
Observed a Das-co crew installing new%" service lines at 3182 N Cherry Grove Way and 990 N Barkvine Ave
Star, Idaho. All procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating, pressure testing, EFV install,
bedding/backfiIling, riser install and purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Bruce Perkins 13-Apr-21
Reviewer: ' Date:
Darrin Ulmer -� ✓ vet
IPUC Form 1