Loading...
HomeMy WebLinkAboutIntermountain Gas 210413 Star Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 13-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: Standard:F—] Construction:F2 ] Training: F__] (T)(D) Integrity Management: El Incident: M/M: = Follow-up: = oQ: F-1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 13 Apr 2021 (2.0) construction) Observed a Das-co crew installing new%" service lines at 3182 N Cherry Grove Way and 990 N Barkvine Ave Star, Idaho. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating, pressure testing, EFV install, bedding/backfiIling, riser install and purging Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Bruce Perkins 13-Apr-21 Reviewer: ' Date: Darrin Ulmer -� ✓ vet IPUC Form 1