Loading...
HomeMy WebLinkAboutIntermountain Gas 210413 Nampa Construction Ali Idaho PUC Pip'�Ii `'i Safety Inspection Summary Inspector(s): Im r Date(s): 13-Apr-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: ConstructionT-1] Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 13 Apr 2021 (1.0) construction) Observed a Das-co crew installing a new W PE service line at 412 10th Ave N#2, Nampa, ID. All procedures were followed. Areas observed during this project were: Line locating, excavating, pot holing, pipe handling, pre-heating, hot tapping, service line installation,tracer wire installation, EFV installation, pressure testing, UT scan, wax wrap installation, bedding and backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Misc. Photos Corrective Action Required: Yes No X Follow-up Required: Aby (date)• Yes No X Inspector (Lead): Date: Reviewer: Date: IPUC Form 1