Idaho PUC Pip'�Ii `'i Safety Inspection Summary
Inspector(s): Im r Date(s): 13-Apr-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard: ConstructionT-1] Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
13 Apr 2021 (1.0) construction)
Observed a Das-co crew installing a new W PE service line at 412 10th Ave N#2, Nampa, ID. All procedures
were followed.
Areas observed during this project were: Line locating, excavating, pot holing, pipe handling, pre-heating, hot
tapping, service line installation,tracer wire installation, EFV installation, pressure testing, UT scan, wax wrap
installation, bedding and backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itinerary
Misc. Photos
Corrective Action Required: Yes No X
Follow-up Required: Aby (date)• Yes No X
Inspector (Lead): Date:
Reviewer: Date: