HomeMy WebLinkAboutIntermountain Gas 210318 Caldwell Construction Idaho PUC Pipeline af 'e Ill� p ` � ty Inspection Summary [Inspector(s): Ulmer/Bro ' Date(s): 18-Mar-21 ompany/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:FI Construction:EJ Training: [� (T)(D) Integrity Management: Incident: M/M: F-1 Follow-up: E:J OQ: E] Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 18 Mar 2021 (2.0)construction) Observed a Das-co crew installing a new W HPSS service line at 5015 E Ustick Rd, Caldwell, ID.All procedures were followed. Areas observed during this project were: Excavating, line locating, pipe handling, welding, wrap coating Attachments: IPUC Form 4 Construction Inspections Das-co daily itinerary Misc. Photos Corrective Action Required: Yes No X Follow-up Required: by( t Yes No X Inspector (Lead): Date: i& �UV Reviewer: Date: IPUC Form 1