p ` � ty Inspection Summary
[Inspector(s): Ulmer/Bro ' Date(s): 18-Mar-21
ompany/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:FI Construction:EJ Training: [� (T)(D) Integrity Management: Incident:
M/M: F-1 Follow-up: E:J OQ: E] Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
18 Mar 2021 (2.0)construction)
Observed a Das-co crew installing a new W HPSS service line at 5015 E Ustick Rd, Caldwell, ID.All procedures
were followed.
Areas observed during this project were: Excavating, line locating, pipe handling, welding, wrap coating
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily itinerary
Misc. Photos
Corrective Action Required: Yes No X
Follow-up Required: by( t Yes No X
Inspector (Lead): Date: