Loading...
HomeMy WebLinkAboutIntermountain Gas 210201-04 Nampa Construction Idaho PUC Pipeline �a \ ty Inspection Summary Inspector(s): Ulmer/Brook Date(s): 174 Feb 2021 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 7 Standard:FI Construction:F7 Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 1-4 Feb 2021 (7 construction) Observed a Das-co crew installing new 4" Main at Star Rd and Cherry Ln, Nampa, Idaho.All procedures were followed. Areas observed during this project were: Excavating, PE fusing, horizontal directional drilling, pipe installation, tracer wire installation, bedding/backfiIling, pigging, shore box installation,trench packing Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: IYes No X Follow-up Required: by(d e): Yes No X Inspector (Lead): Date: r� Reviewer: Date: IPUC Form 1