HomeMy WebLinkAboutIntermountain Gas 210201-04 Nampa Construction Idaho PUC Pipeline �a \ ty Inspection Summary
Inspector(s): Ulmer/Brook Date(s): 174 Feb 2021
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 7
Standard:FI Construction:F7 Training: (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
1-4 Feb 2021 (7 construction)
Observed a Das-co crew installing new 4" Main at Star Rd and Cherry Ln, Nampa, Idaho.All procedures were
followed.
Areas observed during this project were: Excavating, PE fusing, horizontal directional drilling, pipe installation,
tracer wire installation, bedding/backfiIling, pigging, shore box installation,trench packing
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: IYes No X
Follow-up Required: by(d e): Yes No X
Inspector (Lead): Date:
r�
Reviewer: Date:
IPUC Form 1