Inspector(s): Perkins/Brooks Date(s): 1-Feb-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: I..
Standard:F--] Construction:F_2 ] Training: F7 (T)(D) Integrity Management: F-1 Incident: EJ
M/M: F-1 Follow-up: 71 OQ: F-1 Damage Prevention: EJ D&A: E]
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
1 Feb 2021 (2.0)construction)
Observed a Das-co crew installing new W service lines at 9181 &9213 5 Fuego, Kuna, Idaho.All procedures
were followed.Typed up report. Cap&Go Failure, pictures in file.
Areas observed during this project were: Excavating, line locating, pressure testing, EFV install,
bedding/backfilling, riser install and purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): t; - � Date:
Bruce Perkins 1-Feb-21
Reviewer: __fiDate:
Darrin Ulmer ,e of