Loading...
HomeMy WebLinkAboutIntermountain Gas 210201 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 1-Feb-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: I.. Standard:F--] Construction:F_2 ] Training: F7 (T)(D) Integrity Management: F-1 Incident: EJ M/M: F-1 Follow-up: 71 OQ: F-1 Damage Prevention: EJ D&A: E] Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 1 Feb 2021 (2.0)construction) Observed a Das-co crew installing new W service lines at 9181 &9213 5 Fuego, Kuna, Idaho.All procedures were followed.Typed up report. Cap&Go Failure, pictures in file. Areas observed during this project were: Excavating, line locating, pressure testing, EFV install, bedding/backfilling, riser install and purging Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): t; - � Date: Bruce Perkins 1-Feb-21 Reviewer: __fiDate: Darrin Ulmer ,e of IPUC Form 1