Loading...
HomeMy WebLinkAboutIntermountain Gas 210127 Emmett Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 27-Ian-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2 Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: F-1 OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 27 January 2021: (2 Construction) Observed a Das-co crew tapping a 2" steel line and installing a new 3/4" service line to business located at 1900 N Washington Ave, Emmett, Idaho.All procedures were followed. Areas observed during this project were: line locating, bell holing, boring, welding, pressure testing, plastic joining, bedding/backfill, and verified OQ's.Typed up report. Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Job Ticket Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (lead): Date: Perkins �o4��' -Z-7 Reviewer: X Date: AGl c IPUC Form 1