HomeMy WebLinkAboutIntermountain Gas 210127 Emmett Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 27-Ian-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2
Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: F-1 OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
27 January 2021: (2 Construction)
Observed a Das-co crew tapping a 2" steel line and installing a new 3/4" service line to business located at 1900
N Washington Ave, Emmett, Idaho.All procedures were followed. Areas observed during this project were: line
locating, bell holing, boring, welding, pressure testing, plastic joining, bedding/backfill, and verified OQ's.Typed
up report.
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Job Ticket
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (lead): Date:
Perkins �o4��' -Z-7
Reviewer: X Date:
AGl c