HomeMy WebLinkAboutIntermountain Gas 210126 Eagle Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 26-Jan-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2
Standard:F] Construction: 2 Training: F7 (T)(D) Integrity Management: F-1 Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
26 January 2021: (2 Construction)
Observed a Das-co crew installing new 3/4" service line on the new construction home at 1379 N Morehouse,
Eagle, Idaho.All procedures were followed. Areas observed during this project were: line locating,trenching,
pressure testing, plastic joining, bedding/backfill, and verified OQ's Typed up report.
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Job Ticket
Corrective Action Required: Yes No X
Follow-up Required: by date): Yes No X
Inspector (lead): Date:
Perkins
Reviewer: 41 Date:
�(y V aert
IPUC Form 1