Loading...
HomeMy WebLinkAboutIntermountain Gas 210126 Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 26-Jan-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2 Standard:F] Construction: 2 Training: F7 (T)(D) Integrity Management: F-1 Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 26 January 2021: (2 Construction) Observed a Das-co crew installing new 3/4" service line on the new construction home at 1379 N Morehouse, Eagle, Idaho.All procedures were followed. Areas observed during this project were: line locating,trenching, pressure testing, plastic joining, bedding/backfill, and verified OQ's Typed up report. Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Job Ticket Corrective Action Required: Yes No X Follow-up Required: by date): Yes No X Inspector (lead): Date: Perkins Reviewer: 41 Date: �(y V aert IPUC Form 1