HomeMy WebLinkAboutIntermountain Gas 210125 Parma Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 25-Jan-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction: F2 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 25 January 2021: (2 Construction) Observed a Das-co crew installing new 3/4" service line after tapping 2" steel line in the alley at 607 N 7th St, Parma, Idaho. LOC issued for failure to follow procedures. Areas observed during this project were: line locating, trenching, welding, pressure testing, hot tapping, plastic joining, bedding/backfill, and verified OQ's Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Job Ticket Corrective Action Required: Yes No X Follow-up Required: by (date),: Yes No X Inspector(Lead): qx Date: Perkins Reviewer: Date: �Q_ _ _!Rc" jo- IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 27-Ian-21 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2 Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: F-1 OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 27 January 2021: (2 Construction) Observed a Das-co crew tapping a 2" steel line and installing a new 3/4" service line to business located at 1900 N Washington Ave, Emmett, Idaho.All procedures were followed. Areas observed during this project were: line locating, bell holing, boring, welding, pressure testing, plastic joining, bedding/backfill, and verified OQ's.Typed up report. Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Job Ticket Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (lead): Date: Perkins �o4��' -Z-7 Reviewer: X Date: AGl c IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 1-Feb-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: I.. Standard:F--] Construction:F_2 ] Training: F7 (T)(D) Integrity Management: F-1 Incident: EJ M/M: F-1 Follow-up: 71 OQ: F-1 Damage Prevention: EJ D&A: E] Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 1 Feb 2021 (2.0)construction) Observed a Das-co crew installing new W service lines at 9181 &9213 5 Fuego, Kuna, Idaho.All procedures were followed.Typed up report. Cap&Go Failure, pictures in file. Areas observed during this project were: Excavating, line locating, pressure testing, EFV install, bedding/backfilling, riser install and purging Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): t; - � Date: Bruce Perkins 1-Feb-21 Reviewer: __fiDate: Darrin Ulmer ,e of IPUC Form 1