HomeMy WebLinkAboutIntermountain Gas 210125 Parma Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 25-Jan-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard: Construction: F2 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
25 January 2021: (2 Construction)
Observed a Das-co crew installing new 3/4" service line after tapping 2" steel line in the alley at 607 N 7th St,
Parma, Idaho. LOC issued for failure to follow procedures. Areas observed during this project were: line
locating, trenching, welding, pressure testing, hot tapping, plastic joining, bedding/backfill, and verified OQ's
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Job Ticket
Corrective Action Required: Yes No X
Follow-up Required: by (date),: Yes No X
Inspector(Lead): qx Date:
Perkins
Reviewer: Date:
�Q_ _ _!Rc" jo-
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 27-Ian-21
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2
Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: F-1 OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
27 January 2021: (2 Construction)
Observed a Das-co crew tapping a 2" steel line and installing a new 3/4" service line to business located at 1900
N Washington Ave, Emmett, Idaho.All procedures were followed. Areas observed during this project were: line
locating, bell holing, boring, welding, pressure testing, plastic joining, bedding/backfill, and verified OQ's.Typed
up report.
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Job Ticket
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (lead): Date:
Perkins �o4��' -Z-7
Reviewer: X Date:
AGl c
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks Date(s): 1-Feb-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: I..
Standard:F--] Construction:F_2 ] Training: F7 (T)(D) Integrity Management: F-1 Incident: EJ
M/M: F-1 Follow-up: 71 OQ: F-1 Damage Prevention: EJ D&A: E]
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
1 Feb 2021 (2.0)construction)
Observed a Das-co crew installing new W service lines at 9181 &9213 5 Fuego, Kuna, Idaho.All procedures
were followed.Typed up report. Cap&Go Failure, pictures in file.
Areas observed during this project were: Excavating, line locating, pressure testing, EFV install,
bedding/backfilling, riser install and purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): t; - � Date:
Bruce Perkins 1-Feb-21
Reviewer: __fiDate:
Darrin Ulmer ,e of
IPUC Form 1