Loading...
HomeMy WebLinkAboutIntermountain Gas 210120 Wilder Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Brooks Date(s): 20-Jan-21 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:F� Construction:F2 Training: F] (T)(D)Integrity Management: EJ Incident: 71 M/M: F-1 Follow-up: F-1 oQ: F7 Damage Prevention: F-1 D&A: E] Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 20 January 2021: (2 Construction) Observed a Das-co crew installing new 3/4" service line at 105 2nd St E, Golden Gate, Wilder, Idaho.All procedures were followed.Areas observed during this project were: line locating,trenching, boring, bedding/backfill, and verified OQ's Typed up report. Attachments: IPUC Form 1 Inspection Summary IPUC Form 4 Construction Inspections Das-co daily itineraries Corrective Action Required: Yes No X Follow-up Required: by( te): Yes No X Ins ector (Lead): Date: Reviewer: Date: a"- o?/ IPUC Form 1