HomeMy WebLinkAboutIntermountain Gas 210120 Wilder Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins, Brooks Date(s): 20-Jan-21
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:F� Construction:F2 Training: F] (T)(D)Integrity Management: EJ Incident: 71
M/M: F-1 Follow-up: F-1 oQ: F7 Damage Prevention: F-1 D&A: E]
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
20 January 2021: (2 Construction)
Observed a Das-co crew installing new 3/4" service line at 105 2nd St E, Golden Gate, Wilder, Idaho.All
procedures were followed.Areas observed during this project were: line locating,trenching, boring,
bedding/backfill, and verified OQ's Typed up report.
Attachments:
IPUC Form 1 Inspection Summary
IPUC Form 4 Construction Inspections
Das-co daily itineraries
Corrective Action Required: Yes No X
Follow-up Required: by( te): Yes No X
Ins ector (Lead): Date:
Reviewer: Date:
a"- o?/
IPUC Form 1